Shop-House Barndominium on Five Acres
A 40 × 60 shop-house with living quarters up front and a full workshop behind a shared demising wall, built as one continuous envelope.
~16 weeks from dirt work to final walkthrough
Read the case studyCase studies
Every build here is documented the same way we run it — the scope, the timeline, the problem we hit, and how we solved it. A finished photo only tells half the story.
A 40 × 60 shop-house with living quarters up front and a full workshop behind a shared demising wall, built as one continuous envelope.
~16 weeks from dirt work to final walkthrough
Read the case studyA 50 × 70 three-bedroom barndominium on rural acreage, finished to move-in on the living side with a roughed-in flex bay held for a future build-out.
~20 weeks from pad prep to move-in
Read the case studyA 60 × 100 clear-span equipment building sized around the machinery it stores, with door openings and drainage designed before the frame was ordered.
~8 weeks from pad prep to punch list
Read the case studyA 50 × 80 commercial shop with a front office build-out, permitted and sequenced so the owner could open before the lease ran out at the old location.
~14 weeks from dirt work to certificate of occupancy
Read the case studyA 1980s ranch opened up with an engineered flush beam and a full kitchen remodel, sequenced so the family stayed in the house for the duration.
~9 weeks from demo to punch list
Read the case studyA pool house with a full bath and covered outdoor kitchen, built tight to an existing pool without disturbing its plumbing or decking.
~11 weeks from layout to final walkthrough
Read the case studyThe case studies on this page are representative sample projects — written to show how BKG documents a build. They are being replaced with BKG’s real portfolio and photos before launch.